Methodology

We integrate fleets without interrupting your production

A 5-step methodology refined across multiple AMR deployments, delivered with minimal production interference.

The Flow+ AMR integration process in five steps: analysis, concept, build, go-live, operate

Fleet simulation

Your AMR fleet, simulated first

Before anything is ordered, we build your hall in 3D and run the whole fleet against your production: every mobile robot at full size, real cycle times, even a cleaning robot running along. The same model does the fleet sizing and the fleet analysis: how many AMRs you need, what they deliver per hour, how busy they are and how long your machines wait, also at a production peak. The mobile robots we deploy are in the showroom.

From first call to running fleet

  1. Analysis

    Typically 2–4 weeks

    On-site walkthrough. Product flow mapping. WMS/ERP review. We collect data on order patterns, peak windows, and your existing automation. Output: a written assessment with rough scope and ballpark range.

    Deliverable Operational assessment + indicative scope

  2. Concept

    Typically 2–3 weeks

    Fleet sizing. Vendor selection. WMS/ERP integration architecture. Wave deployment plan. Pricing. A 3D simulation of your hall shows the fleet at work before anything is ordered, and checks that it keeps up with production in different scenarios, such as a production peak. Reviewed first with your engineering team, then with operations leadership.

    Deliverable Detailed concept proposal: fleet, 3D simulation, software, integration, phasing, pricing

  3. Build

    Typically 8–16 weeks

    Flow+ Ctrl configuration against the agreed scope. WMS/ERP integration development. Robot procurement and pre-deployment commissioning.

    Deliverable Validated system, ready for wave 1

  4. Go-live

    One cutover window per wave, typically 2–4 waves

    Cutover in a low-traffic window, over a weekend if you want minimal downtime (optional). Operator training in the days before. Our team is on-site during go-live and on standby for an agreed period afterwards. We always keep a backup plan in place, so your operation keeps running in all situations. Production resumes on the new system, or we roll back before the next shift.

    Deliverable Live fleet, production running, operators trained

  5. Operate

    Continuous, for as long as you want us

    SLA support tier of your choice. On-call team on Tier 1. Service-hour packs for expansion, tuning, or new integrations as your operation evolves.

    Deliverable An AMR fleet that grows with your operation

Four guarantees we build into every project

Minimal production interference

Optional weekend windows, dry-runs.

Production backup plan

A backup plan for operations, so production keeps running if the fleet is down or during maintenance and updates.

Customer-owned software

Flow+ Ctrl runs on your infrastructure, with full documentation.

Transparent SLA

What we cover, what we don't, what it costs. Before you sign.

Ready to map this against your operation?

We'll run a ROI analysis on your floor (pick rates, shift costs, downtime exposure) and tell you what the fleet would realistically deliver.